Central AC installed from about 2010 to 2025 may well run on R-410A, a refrigerant that new equipment is now moving away from.

Houses built
2010–2025
Dates from
Federal rule: Dates come from a federal rule or a model building code.
How common
Likely
Priority
Good to know
Mainly about
Cost
Where to look
Heating & cooling

What it is

From January 1, 2025, EPA restricts making or importing new home air conditioning systems that use refrigerants above its global-warming limit, which R-410A exceeds, so new equipment is moving to alternatives. EPA sets no installation deadline for systems whose parts were all made before that date.

How sure the dates are

Federal rule: Dates come from a federal rule or a model building code.

Dates come from a federal rule or a model building code. What the labels mean

How common it is

Likely

No count of homes exists. EPA barred making new equipment with R-22 from January 1, 2010; that most systems since then use R-410A is an inference, not a sourced figure.

The years

Houses built from 2010 to 2025 may have it. It is most likely in houses built 2010 to 2024.

Earliest
About 2010An approximate date. It came in gradually, and sources differ by a few years.
Most likely
2010–2024The years it is most common: the solid part of the band.
Latest
About 2025An approximate date. The change came gradually, so a few later houses may have it.
  • Solid: most likely years
  • Faded edge: approximate date
  • Sharp edge: legal or recall date
  • Hatched: protection missing
  • Check first

Year predicts poorly

This was often added to older houses later, so check for it whatever the build year.

How to check

  1. Find the nameplate on the outdoor unit.

  2. Look for the refrigerant listed: R-410A, R-22, or a newer type such as R-454B or R-32.

Where to look
  • Heating & cooling

What to do

If you find itNothing is required for a working system. When it is time to replace it, ask the contractor which refrigerant the new system uses and whether any other parts need changing.

Sources

4 verified sources, 4 primary. Each quote is copied word for word from the page linked.

  1. U.S. Environmental Protection AgencyPrimary source

    portable room air conditioning) 700 January 1, 2025

    epa.gov/hfcs/technology-transitions-hfc-restrictions-… (opens in a new tab)
  2. U.S. Environmental Protection AgencyPrimary source

    No installation compliance date for systems where all specified components were manufactured or imported prior to January 1, 2025.

    epa.gov/hfcs/technology-transitions-hfc-restrictions-… (opens in a new tab)
  3. U.S. Environmental Protection AgencyPrimary source

    R-410A 2,090 No

    epa.gov/sites/default/files/2018-08/documents/residen… (opens in a new tab)
  4. EPAPrimary source

    neither appliances nor components pre-charged with HCFC-22 (also called R-22) or HCFC-142b may be manufactured as of January 1, 2010.

    epa.gov/ods-phaseout/equipment-manufacturers-importer… (opens in a new tab)

A source misread, out of date or missing?Report an error on this page

Applies to houses built

Open the full report for a year to see everything else houses of that age have in common.

A guide to what to look for. Not an inspection.