Year Built

Often present · Roof, walls & windows

Pella ProLine casement windows

Pella ProLine aluminum-clad wood casement, awning and transom windows made from 1991 to 2009 were the subject of a class settlement over claims that water could get in and rot the wood.

Houses built
1991–2009
Dates from
Court record: Dates come from a court settlement or a product recall.
How common
No reliable count exists
Priority
Good to know
Mainly about
Cost
Where to look
Windows

What it is

A federal class settlement, finally approved in 2019, covered ProLine casement, awning and transom windows made from January 1, 1991 to December 31, 2009. The claim was a design defect that let water get behind the aluminum cladding. Soft or stained wood at the bottom of the sash is the sign to look for.

How sure the dates are

Court record: Dates come from a court settlement or a product recall.

Dates come from a court settlement or a product recall. What the labels mean

How common it is

No reliable count exists

This is one product line from one maker.

The years

Houses built from 1991 to 2009 may have it.

Earliest
1991A fixed date, set by a rule, a recall or a court record.
Most likely
Not narrowedSources give no narrower window, so treat every year in the range alike.
Latest
2009A fixed date, such as a ban, a recall or a code change.
  • Solid: most likely years
  • Faded edge: approximate date
  • Sharp edge: legal or recall date
  • Hatched: protection missing
  • Check first

How to check

  1. Look for the Pella name etched in a corner of the glass or on the hardware.

  2. These windows have aluminum cladding outside and wood inside.

  3. Check the bottom of each sash for soft or stained wood.

Where to look
  • Windows

What to do

If you find itReplace rotted sashes or whole units. The settlement's claim deadline could not be confirmed, so contact Pella or the settlement administrator to ask whether claims are still open.

Sources

2 verified sources, 2 primary. Each quote is copied word for word from the page linked.

  1. US District Court, N.D. Illinois, Eubank v. Pella Corp., No. 06 C 4481, order granting final approval, filed 15 March 2019 (govinfo)Primary source

    manufactured by Pella Corporation between January 1, 1991 and December 31, 2009

    govinfo.gov/content/pkg/USCOURTS-ilnd-1_06-cv-04481/p… (opens in a new tab)
  2. US Court of Appeals, 7th Circuit, Eubank v. Pella Corp., Nos. 13-2091 et al., decided 2 June 2014 (govinfo)Primary source

    manufactured and sold between 1991 and 2006 had a design defect that allowed water to enter behind the

    govinfo.gov/content/pkg/USCOURTS-ca7-13-02091/pdf/USC… (opens in a new tab)

A source misread, out of date or missing?Report an error on this page

Applies to houses built

Open the full report for a year to see everything else houses of that age have in common.

A guide to what to look for. Not an inspection.