Built without · Structure
Mobile home built before the HUD Code
Mobile homes made before June 15, 1976 predate the federal HUD Code and cannot get FHA-insured mortgages.
- Houses built without it
- 1976 or earlier
- Dates from
- Federal rule: Dates come from a federal rule or a model building code.
- How common
- No reliable count exists
- Priority
- Worth a look
- Mainly about
- Cost
- Where to look
- Exterior walls · Whole house
What it is
Every manufactured home built after June 15, 1976 should carry a HUD certification label and meet federal construction and safety standards. Earlier units were built before those standards and have no HUD label. This matters only if your home is a manufactured (mobile) home.
How sure the dates are
Federal rule: Dates come from a federal rule or a model building code.Dates come from a federal rule or a model building code. What the labels mean
How common it is
No reliable count existsNo reliable count exists of surviving pre-1976 units. Every mobile home made before the date predates the HUD Code by definition.
The years
Houses built in 1976 or earlier were built without it, unless it has been added since.
- Earliest
- Before 1880No start date. It reaches back past 1880, where these records begin.
- Most likely
- Not narrowedSources give no narrower window, so treat every year in the range alike.
- Latest
- 1976A fixed date: after this, a rule or model code called for it.
- Solid: most likely years
- Faded edge: approximate date
- Sharp edge: legal or recall date
- Hatched: protection missing
- Check first
How to check
Look for a metal certification label, about 2 by 4 inches, riveted to the outside at the tail end of each section.
Look for a paper data plate inside, often in a kitchen cabinet, the electrical panel or a bedroom closet, giving the manufacture date.
No label and no data plate, plus a title showing a pre-1976 year, means pre-HUD Code.
- Exterior walls
- Whole house
What to do
If it was never addedFocus on safety upgrades such as smoke alarms, a wiring evaluation and tie-downs. Expect financing limits: FHA insures only manufactured homes built on or after June 15, 1976, and HUD says a removed label cannot be reattached to make a home eligible.
Sources
6 verified sources, 5 primary. Each quote is copied word for word from the page linked.
HUD Office of Manufactured Housing Programs (labels page)Primary source
hud.gov/hud-partners/manufactured-home-labels (opens in a new tab)If the certification label (also known as a HUD tag) is missing from a home, the Department does not reissue labels for manufactured homes.
HUD Mortgagee Letter 2009-16Primary source
hud.gov/sites/documents/09-16ml.pdf (opens in a new tab)be constructed after June 15, 1976, in conformance with the Federal Manufactured Home Construction and Safety Standards, as evidenced by an affixed certification label
HUD Mortgagee Letter 2009-16Primary source
hud.gov/sites/documents/09-16ml.pdf (opens in a new tab)manufactured homes produced prior to that date are ineligible for insured financing
HUD (Handbook 4150.2 ch. 8)Primary source
hud.gov/sites/documents/41502c8hsgh.pdf (opens in a new tab)The manufactured home must not have been constructed before June 15, 1976.
HUD (Handbook 4150.2 ch. 8)Primary source
hud.gov/sites/documents/41502c8hsgh.pdf (opens in a new tab)If it has been removed, it cannot be reattached to make it acceptable for FHA insurance.
Wikipedia (Manufactured housing)Reference
en.wikipedia.org/wiki/Manufactured_housing (opens in a new tab)The Federal Manufactured Home Construction and Safety Standards (commonly known as the HUD Code) went into effect June 15, 1976.
A source misread, out of date or missing?Report an error on this page
Reports for houses built without it
Open the full report for a year to see everything else houses of that age have in common.
A guide to what to look for. Not an inspection.